Cion|Coulter was retained by the Board of Directors at BCC #21 to perform engineering services related to the investigation/design, preparation of project specifications and drawings, and contract administration for this project. Scope of work included replacement of existing aluminum framed units equipped with a combination of multi-lite (operable) windows and insulated (fixed) windows. ... More
Kevin Shaw
Related News, Insights and Projects
Old vs. New Condos
Are there any differences between reserve fund studies for older condos versus new ones? Kevin Shaw discusses the differences to the studies ... More
by Kevin Shaw