Capital Asset Management

Building Envelope Feasibility Study – Wilson Subway Station, Toronto Transit Commission, Toronto ON

In collaboration with NORR, Cion was retained to provide a feasibility study (preliminary design review) that described the constraints of the construction project and provided three different design solutions. NORR provided senior review of the associated structural, electrical and mechanical systems. One major challenge was the logistics of replacing 300 concrete panels from a subway station that is operational 21.5 hours per day and is situated within one meter from the north and southbound Allen Expressway.  

Read More »

Building Condition Assessment – York Region Administration, Newmarket, ON

Cion Coulter was selected in 2018 in a competitive public tender to conduct building condition assessments for 68 facilities for the York Region Administration. These consisted of administrative offices, paramedic response stations, long term care facilities, roads operations and maintenance facilities, solid waste management facilities and mixed-use facilities. The facilities range in age from heritage to newly constructed. The four-year project is phased according to the needs of York Region. 

Read More »

MTCC 955 Window Wall Replacement

Cion Coulter was retained in 2018 to assess fenestration renewal completed by a previous consultant and contractor at the penthouse levels of the 222 The Esplanade building in Toronto, ON. The previous project by the previous Consultant had been drastically overbudget and the cause of a special assessment.

Read More »
Shingle Roof Replacement

Shingle Roof Replacement

Cion Coulter Corp (Cion) was retained by the Corporation to prepare contract documents, tendering of the project to pre-qualified contractors and to provide contract administration services. The three-storey townhouses

Read More »