Performance Audit And Reserve Fund Study (66 Unit Townhouse Site)
Cion|Coulter was retained by the Board of Directors to prepare the Corporation’s first year Performance Audit and Class 1 Comprehensive Reserve Fund Study. The site consists of 66 3 storey residential townhouse units ... More
Building Condition Assessments / Design & Specifications for Restoration Projects
NORR Limited, including Cion|Coulter., were retained by Defence Construction Canada to manage and produce Building Condition Assessment reports covering 18 buildings in the Greater Toronto Area. ... More
Building Condition Audits and Reserve Fund Studies
Cion|Coulter has completed the two of three phases for the City of Brampton BCA Project, a portfolio consisting of over 150 properties. ... More
Latest Projects
Building Condition Assessments/Building Systems Operating Manuals
Cion | Coulter (then known as Cion Corp.) was retained by Allied Properties REIT to conduct Building Condition Assessments (BCA) for a portfolio of 50+ buildings. The Buildings range in size from 7,500 Square Feet to over 200,000. ... More
Window Replacement Feasibility Study
NORR / Cion|Coulter were retained by CAMH to provide a feasibility study for the replacement of the glazing systems at 250 College Street West. ... More
Building Condition Audits and Reserve Fund Studies
Cion|Coulter has completed the two of three phases for the City of Brampton BCA Project, a portfolio consisting of over 150 properties. ... More
Building Condition Assessments / Design & Specifications for Restoration Projects
NORR Limited, including Cion|Coulter., were retained by Defence Construction Canada to manage and produce Building Condition Assessment reports covering 18 buildings in the Greater Toronto Area. ... More
Window and Sliding Patio Door Replacement
Cion|Coulter was retained by the Board of Directors at BCC #21 to perform engineering services related to the investigation/design, preparation of project specifications and drawings, and contract administration for this project. Scope of work included replacement of existing aluminum framed units equipped with a combination of multi-lite (operable) windows and insulated (fixed) windows. ... More
by Kevin Shaw
Shingle Roof Replacement
The firm was retained by the Corporation to prepare contract documents, tendering of the project to pre-qualified contractors and to provide contract administration services. The three storey townhouses have sloped roofs clad in asphalt shingles. The units also have shingle clad mansard roofs. ... More